Septic pit
22% of homes used a septic pit; in rural areas, 52.6%.
Source: INE, 2011 Census, via WHO/UNICEF JMPVenezuela
In Venezuela the sanitary regulations allow an on-site system where there is no public sewer, and systems not described in the regulations can be approved by the health authority. Installing a plant and discharging or infiltrating the treated water also requires environmental permits. With the basic data on the site and the project, we carry out an initial assessment; the final solution is then developed with the appropriate professionals and permits. This page is general guidance and does not replace legal advice.
Common practice today
According to the 2011 Census, the most recent official figures, 22% of homes discharged their wastewater into a septic pit; in rural areas, more than half.
22% of homes used a septic pit; in rural areas, 52.6%.
Source: INE, 2011 Census, via WHO/UNICEF JMPThis is the system described in the sanitary regulations: the effluent from the septic tank infiltrates into the soil through soakaways or absorption trenches.
Source: Normas Sanitarias para Edificaciones, Official Gazette 4,044 Extraordinary, arts. 497 and 506In 2011, 28.2% of rural homes had neither a flush toilet (poceta) nor a privy, and 5.1% used a latrine.
Source: INE, 2011 Census, via WHO/UNICEF JMPLegal framework
Where there is no public sewer, an on-site treatment and disposal system is allowed (art. 101). Systems not provided for in the standard, such as a compact plant, are submitted to the Autoridad Sanitaria (health authority) for consideration (art. 529). Infiltration requires a percolation test (art. 513).
Source: Normas Sanitarias, G.O. 4,044 Ext. (transcription)Classifies bodies of water and sets limits for discharges into rivers, lakes, the sea and sewer networks; it prohibits infiltrating discharges into the soil that exceed those limits (art. 16). Hotels and housing developments must register in the register of activities liable to degrade the environment.
Source: Decreto (decree) 883, FAOLEXInstalling a treatment plant requires a certificate of conforming use (constancia de uso conforme) from the environment ministry (art. 98); discharging, injecting or infiltrating effluent requires its prior authorisation (art. 100). The wastewater service is the responsibility of the municipalities (art. 51).
Source: Ley de Calidad de las Aguas y del Aire (Water and Air Quality Law), FAOLEXEvery project begins with a Documento de Intención (statement of intent) submitted to the environment ministry. Large tourism or residential developments outside urban areas require an environmental impact study; smaller ones, a specific assessment.
Source: Decree 1,257, FAOLEXAnyone who generates effluent must minimise its quantity and improve its quality (art. 13). It keeps Decreto 883 in force until it is updated.
Source: Ley de Aguas, G.O. 38,595 (transcription)The route
The usual sequence, from the site to the plant in operation.
Using the checklist below, Ektennsa and AQUATO look at the capacity, which system suits the project (PUMP, STABI-KOM or ORKA), where it goes and where the treated water will be discharged.
The Documento de Intención is submitted to the environment ministry, which decides whether an environmental impact study, a specific assessment or only the standard supporting documents (recaudos) are needed. After that comes the land occupation authorisation.
Your professionals prepare the design using AQUATO's technical documentation: sanitary approval of the system, certificate of conforming use for the plant and authorisation for discharge or infiltration.
Registration in the register of activities, characterisation of the effluent at least once a year and periodic inspection of the system.
To get started
Leave blank anything you do not have yet. Nothing more is needed to get started.
Location
State, municipality and whether the site is inside or outside the urban area
Site
Area and space available for the plant
Project
Type of project and number of homes, rooms or units
Users
Approximate number of users and expected peak occupancy
Sewer system
Is there a public sewer that could serve the site?
Ground conditions
Percolation test, water table and distance to water wells
Available documents
Site plan and any permits already obtained
Treated water
Infiltration into the soil, discharge into a body of water or reuse
First step
With the basic details of the site and the project, Ektennsa and AQUATO carry out an initial assessment.
or directly: WhatsApp · contacto@ektennsa.com