Skip to content
Ektennsa Inteligencia del agua.

Premium · 50 to 3,000 PE

ORKA: treatment technology for up to three thousand population equivalents.

The premium plant for hotels, property developers and municipalities: high-performance SSB® process, designed to measure for each project, with PROCloud remote maintenance as standard.

ORKA with a trip to Germany: approx. €54,000 See the special offer
Capacity
50 to 3,000 PE
System
SSB®, 100% biological
Design
Made to measure to EN 12255
Remote maintenance
PROCloud as standard

Three strengths

What sets the ORKA apart.

  • SSB® process

    AQUATO's own SSB® process (sequential stabilised activated sludge process): single-stage activated sludge with integrated sludge stabilisation. High, stable performance even with peaks or low load, with minimal sludge removal. Also available as an SBR process on request.

  • Designed to measure

    No fixed size grid: every ORKA is sized to your project on a modular construction principle, from 50 to 3,000 PE. The technology adapts to the tank, round or rectangular, and can be extended in later construction phases.

  • PROCloud remote maintenance

    Oxygen, sludge values and power consumption arrive in real time, and fault patterns become visible early. The operator and the service partner see the same data.

References

An ORKA plant in operation.

Drawing of a reference plant and photos of an installed ORKA, from AQUATO's reference material: technology in the tank, control unit and compressor, installation and operation.

How it works

The SSB® process

  1. 1 Aeration Aeration and biological breakdown
  2. 2 Settling The sludge settles
  3. 3 Discharge Clear water flows out
The ORKA brings the SSB® biological process to a large scale. In large projects it is split into several independent lines.
The SSB® process in an AQUATO animation.

PROCloud

Remote maintenance with real-time telemetry.

PROCloud continuously records oxygen, sludge values, temperature and power consumption, for each module section separately. Deviations from the norm trigger an automatic alert to the operator and the service partner, and maintenance records are documented and can be exported as PDF as evidence for the authorities.

For property developers and municipalities this is a key argument with the authorities: the plant keeps a complete record of itself, and many faults are dealt with before they become visible. More about PROCloud.

What is included

The components of the ORKA.

Four functional units, sized per project. We include the tank in the quote as an estimate; the final price depends on construction costs in your country. For the ORKA we recommend concrete, built on site by a local construction company following AQUATO's drawings: for plants of this size it is the most robust and usually the most economical solution. A delivered plastic tank is also possible. In both cases, the drawings, the technology and the coordination with the construction company go through us. Because it is built on site, the concrete option needs some planning time.

  • Solids separation

    Before the biological stage, it holds back coarse solids and protects the technology downstream.

  • Aeration unit

    Introduces the air for biological treatment at the bottom of the tank.

  • Lifting unit

    Moves the water between stages with compressed air, with no electrical components in the water.

  • Plant control

    The cabinet, installed in a dry place, with the control unit and the compressors. With PROCloud, the data is available remotely.

Training and commissioning

Training at the factory or commissioning on site.

AQUATO does more than supply the technology. If you wish, AQUATO also supports the installation and commissioning, and passes on the knowledge your team needs to run the plant.

  • Training at AQUATO, Germany

    A technician from the hotel, the company or the future operator travels to Germany: welcome in Berlin, first-class train to Herford and about three days of training at the AQUATO factory. We interpret everything into Spanish or English. The ORKA quote includes flights, hotel, meals and training.

    See the trip
  • Installation and training in South America

    Alternatively, one or two AQUATO technicians travel to South America. They install the ORKA together with the local team, commission it and train your staff directly at the plant. These costs are not included in the purchase price: we calculate them according to the size of the plant and your technical needs and present them in a separate quote.

Additional options

Additional treatment stages.

Depending on the requirements and the receiving water, the ORKA can be extended with additional treatment stages, individually or combined.

  • Module H: UV disinfection

    Chemical-free UV disinfection for maximum hygiene, ideal for water reuse.

  • Module P: phosphorus removal

    Effective phosphorus removal to protect sensitive waters.

  • Module C: nitrogen removal

    Stable nitrogen removal, even when the load on the plant varies.

Biology without chemicals, on a large scale too.

From 50 to 3,000 population equivalents, every plant designed to measure.

Technical data

ORKA: reference values for sizing.

The ORKA is sized to measure for each project on a modular construction principle; there is no fixed size grid. The following values are sizing references (150 litres per population equivalent per day); we review the final sizing with you in the project enquiry. The SSB® process, the same one that works in the ORKA, achieved removal rates of COD 95%, BOD5 99%, TSS 96%, ammonium 98% and nitrogen 77% in the EN 12566-3 test of the STABI-KOM. The ORKA has no test values of its own, because that test only covers up to 50 PE. It can be supplemented with additional stages for nitrogen, phosphorus or hygienisation if required. On request, the ORKA is also available with the SBR process.

  • Design size
    75 PE
    Flow (sizing)
    11.3 m³/day
    Plant volume
    33 m³
    System
    SSB®
    Approval
    EN 12255 / per project
  • Design size
    150 PE
    Flow (sizing)
    22.5 m³/day
    Plant volume
    66 m³
    System
    SSB®
    Approval
    EN 12255 / per project
  • Design size
    300 PE
    Flow (sizing)
    45.0 m³/day
    Plant volume
    123 m³
    System
    SSB®
    Approval
    EN 12255 / per project
  • Design size
    500 PE
    Flow (sizing)
    75.0 m³/day
    Plant volume
    204 m³
    System
    SSB®
    Approval
    EN 12255 / per project
  • Design size
    1,000 PE
    Flow (sizing)
    150.0 m³/day
    Plant volume
    388 m³
    System
    SSB®
    Approval
    EN 12255 / per project
  • Design size
    3,000 PE
    Flow (sizing)
    450.0 m³/day
    Plant volume
    1,078 m³
    System
    SSB®
    Approval
    EN 12255 / per project

Plant layout

How an ORKA plant is put together.

Several SSB reactors work in parallel, preceded by an inlet pumping station with a screen, plus a sludge store. The plant is sized per project; the diagram shows the typical layout.

Inflow Inlet pumping station with screen SSB reactors Sludge storage Outflow
Simplified flow diagram of a reference ORKA plant. The number of reactors depends on the sizing.

Purchase options

Two ways to receive your plant.

The technology comes from Germany. For the tank there are two routes, which we recommend depending on location and budget.

  • Recommended

    Option A

    Technology from Germany, concrete tanks built on site.

    AQUATO supplies the technology: solids separation, aeration, airlift pumps and the plant control system with compressors. A construction company in your country builds the concrete tanks to AQUATO plans, and we include an estimate of the construction costs in our quote.

    What you receive:

    • Technology and control system from the AQUATO factory, with PROCloud
    • AQUATO plans for the tanks
    • Coordination with the construction company and support with the acceptance inspection
    • Designed to EN 12255, sized for each project
  • Option B · Alternative

    Delivered plastic tank, where the project allows it.

    Technology and control system as in Option A, with the tanks supplied in plastic.

ORKA is modular and often uses several tanks.

During the consultation we recommend the right option for you.

ORKA with a trip to Germany

German technology for 80 population equivalents, with training directly at the factory.

ORKA for 80 PE

PE stands for population equivalent: the wastewater one person produces per day. 80 PE is sized for 80 people.

approx. €54,000

For 80 people that is €675 per person.

Special offer valid until 31 December 2026

Included in the price

  • AQUATO ORKA technology for 80 PE
  • Preliminary estimate of seven concrete tanks, manufactured or built in your country
  • Trip to Germany for one technician: flight, four nights in a hotel, meals and first-class train travel
  • Around three days of training at AQUATO, with support and interpreting from Ektennsa

Estimated net price. The final figure depends on what it costs to manufacture or build the tanks in your country.

The ORKA is sized to the project, from 50 to 3,000 PE. The figure is an estimate for an 80 PE plant, with a preliminary estimate of seven concrete tanks. We obtain quotes for the actual tank costs in your country. Sea freight, on-site assembly and permits are not included. Ask us for a specific offer for your case.

What your stay in Germany looks like

Applications

Who the ORKA is made for.

  • Aerial view of a coastal village among palm trees and vegetation

    For hotels and tourism

    For larger resorts and hotel complexes from 50 people without a sewer connection, the ORKA is the standard solution. Smaller lodges and cabins are served by the PUMP and the STABI-KOM. Its made-to-measure design fits projects built in phases.

  • Aerial view of a town beside a reservoir between mountains

    For municipalities

    Rural municipalities without a sewer network get a decentralised plant with German technology and a service contract with the ORKA. Eligible for funding depending on the region.

  • Modern house under construction

    For property developers

    For housing developments and larger subdivisions, the ORKA handles several house connections at once. Extending it in later phases does not affect what has already been built.

First step

Send a project enquiry about the ORKA.

Tell us the project size, the estimated population equivalents, the region and the timeline. We recommend the right sizing and arrange a site visit with you. We reply within two working days.

or directly: WhatsApp · contacto@ektennsa.com