Septic tank with infiltration
This is the alternative that standard IS.020 provides for in areas without a network, always followed by a percolation system. Infiltrating untreated wastewater is not permitted.
Source: Standard IS.020 (RNE), gob.pePeru
You do not need to wait for the sewer system to arrive or to have the final design. With the basic data on the site and the project, we carry out an initial assessment; the final solution is then developed with the appropriate professionals and permits. This page is general guidance and does not replace legal advice.
Common practice today
Peruvian regulations provide for the septic tank where there is no network, but consider it only a primary treatment. In the countryside, the cesspit is still more common.
This is the alternative that standard IS.020 provides for in areas without a network, always followed by a percolation system. Infiltrating untreated wastewater is not permitted.
Source: Standard IS.020 (RNE), gob.peThe effluent from the septic tank is not suitable for a body of water and needs complementary treatment. The tank is inspected at least once a year and the sludge is removed periodically.
Source: Standard IS.020 (RNE), gob.peThe basic sanitation units of the Ministry of Housing use a septic tank or biodigester, always with a soakaway or infiltration trench.
Source: Ministry of Housing, 15 May 2025In rural areas, 24.5% of the population dispose of excreta in a cesspit and 14.8% in a septic pit.
Source: INEI, water and sanitation bulletin 2024Legal framework
Approves the consolidated text (Texto Único Ordenado) of Decreto Legislativo 1280. It is the national framework for drinking water and sanitation services, in urban and rural areas, and includes the treatment of wastewater for final disposal or reuse.
Source: DS 001-2025-VIVIENDA (supreme decree), gob.peThe technical standard of the Reglamento Nacional de Edificaciones (National Building Regulations) allows on-site solutions in rural or urban areas without a sewer network, or where the network is too far away. It requires sufficient area for their operation, at the discretion of the health authorities.
Source: Standard IS.020 (RNE), gob.peRegulates urban development approvals (habilitaciones urbanas) and buildings. The municipality issues the certificate of planning and building parameters and the building licence.
Source: Ley 29090, Congress of the RepublicIf the treated water is discharged into a river, lake or the sea, the Autoridad Nacional del Agua (ANA, National Water Authority) authorises it on the basis of the quality standards and maximum permissible limits (art. 79). Reuse of the treated water also requires authorisation from the ANA.
Source: Ley 29338 (Water Resources Law), MINAMThe route
The usual sequence, from the site to the plant in operation.
Using the checklist below, Ektennsa and AQUATO look at the capacity, which system suits the project (PUMP, STABI-KOM or ORKA), where it goes and how the effluent will be disposed of.
The municipality's certificate of parameters shows what can be built; the building licence is applied for under Ley 29090.
Your professionals develop the design of the on-site solution according to the technical standards, using AQUATO's technical documentation.
If the effluent is discharged into a body of water or reused, the ANA authorises it. We define this with your professionals from the assessment stage.
To get started
Leave blank anything you do not have yet. Nothing more is needed to get started.
Location
Region, province, district and coordinates
Site
Area and land registry entry (partida registral)
Project
Type of project and number of homes, units or facilities
Users
Approximate number of users and expected peak occupancy
Sanitation
Is there a public network? Is there none? Is it out of reach of the project?
Ground conditions
Soil, slope, water table, infiltration
Available documents
Title or land registry entry, certificate of parameters, site plan
Effluent
Intended location for infiltration, discharge or reuse
First step
With the basic details of the site and the project, Ektennsa and AQUATO carry out an initial assessment.
or directly: WhatsApp · contacto@ektennsa.com