The usual order, from the site to the plant in operation.
-
01
Basic data and preliminary assessment
Using the checklist below, Ektennsa and AQUATO look at the capacity, which system suits the project (PUMP, STABI-KOM or ORKA), its location and where the treated water will go.
-
02
Certificate of network availability
The competent body, the local EPSA (water and sanitation utility) or the municipality, certifies whether a connection to the network is possible. If it is not, the project provides for an on-site solution.
-
03
Sanitary installation project
Your professionals draw up the project with plans, design calculations and infiltration tests, using the AQUATO technical documentation, and submit it for approval. Depending on the size, Ley 1333 also requires environmental categorisation.
-
04
Construction, inspection and handover
The installation is carried out under supervision, with tests and technical inspections, until the works are formally accepted.