Concepción
Installation in Concepción
- Private home
- PUMP
- 8 PE
- Since September 2022
Starting point
A private owner built a home with his own construction company on a plot near Concepción, around 500 kilometres south of Santiago, with no connection to the public sewer.
Solution
An AQUATO biological treatment plant was installed as part of the same construction work. On the second day of installation, the owner himself started up the pump together with us and programmed it.
Result
The family moved into the house with the wastewater already taken care of. The treated water seeps cleanly into the ground, without chemicals, without odours and without putting groundwater at risk.